Blinn Chiller Replacement and Central Plant Upgrades
Owner: Blinn College
Contractor: ACO Mechanical
Size/Scope:
Replacement of a 430ton chiller, 10,000gal Ice Tank, and 2 pumps. Contract included temporary cooling measures, all HVAC upgrades, electrical component upgrades and replacements, and Control System modifications.